iTaskX
:Tech Specs
Powerful project management for Mac OS X
Tech Specs
Note iTaskX is available in English and German.
System Requirements
Macintosh computer with a PowerPC G3
(min. 500 MHz),
G4 or G5 processor
(G5 or Intel processor recommended).
Min. 512 MB of physical RAM
(768 MB or more of physical RAM recommended).
Mac OS X 10.4.2 or later
(Mac OS X 10.5.2 or later recommended).
Tiger, Leopard and Intel compatible!
Display with at least 1024-by-768-pixel resolution.
About 25 MB of disk space required to install iTaskX.
Appearance
Multiple default Views (Gantt View, Tracking Gantt, Calendar, Network Diagram, Task Sheet, Task Usage, Resource Sheet, Resource Usage).
Possibility to format each table row individually.
Possibility to adjust the height of each table row individually.
Possibility to configure the displayed columns of each table.
Extensive display options for the Gantt Bars (shape, color, shadow...).
Extensive format options for the timescale.
Individually configurable custom views.
Print preview with page margins and complete set of controls to adjust the page settings for perfect print outs.
Usability
Supports multiple selections.
Integrated Project Guide.
Extensive Help files.
Supports shortcuts and context-menus for importance commands.
Interactive scheduling messages.
Quick insert of multiple tasks through the help of a special sheet.
Import of Resources from Address Book, Directory server and Public Folders of a Microsoft Exchange Servers.
Context menus.
Provides specialized sheets for updating the progress of selected tasks or the whole project.
Calculation of the project in real-time.
Complete support for drag and drop in the Gantt views.
Supports Templates.
Spotlight searching (Mac OS X 10.4 Tiger).
Scheduling and tracking
Complete task constraints (start as soon as possible, start as late as possible, must start on, must finish on, start no earlier than, start no later than, finish no earlier than, finish no later than).
Supports all possible task dependencies (Finish to Finish, Finish to Start, Start to Start, Start to Finish) and positive or negative lags for task links.
Extensive task information's (over 60 task fields).
Supports linking of summary tasks.
Effort driven scheduling (standard).
Configurable task types (Fixed Duration, Fixed Work and Fixed Units).
Scheduled, base und actual task dates for effective tracking.
Calculation of start slack, finish slack, free slack and total slack for tasks.
Support of work (persons or groups of people) and material (supplies, stock or other consumable items) resources.
Support of work and overtime work for assignments.
Support of time units for assignments units (for example, 5 Liter/h) of material resources.
Supports Fixed Costs, Cost per Use, Standard Rate and Overtime Rate.
Possibility to specify the cost accrual (Start, Prorated, End).
Supports of different calendars for the project, timescale, tasks and resources.
Multiple task splitts.
WBS codes .
Data exchange
Microsoft Project MPP format (read only).
Microsoft Project XML format.
Microsoft Project MPX format.
TXT (tab separated values).
CSV (comma separated values).
ICS (iCal calendar format).
OPML format.
Possibility to export each view as image (PDF, JPG, EPS, TIF, PNG).
„After trying it out for 5 minutes this became my favorite Mac-compatible PM tool. It has everything I demand in a tool (after 20+ years experience) including a network diagram view, which most PM tools don't have.”
Frank R. Parth,
MS, MSSM, MBA, PMP
www.ProjectAuditors.com
iTaskX awarded 5 Stars at bestshareware.net